Our standard production lead-time is two to three weeks (depending on the production load) after receipt of final shop drawing forms and approval of color match, if required. Additional time should be allowed for shipping.
Articles in this section
- Roll-Up Door Warranty
- Q: What type of support is required in a door opening?
- Q: Can I remove slats once a door arrives on site?
- Q: Are Woodfold Roll-Up Doors available with sound rating?
- Q: Are your Roll-Up Doors available with fire rating?
- Q: How quickly can I get a Woodfold Roll-Up Door?
- Q: Can I change the location of a latch or lock - move it front to back for example - once my Roll-Up Door is onsite?
- Q: How are thumb turns and keylocks mounted? What about slide bolts?
- Q: What types of latches can I choose from?
- Q: Are your Roll-Up Doors guaranteed?
Comments
0 comments
Article is closed for comments.