A: Here at Woodfold, we are noted for our quality and our speed. Our normal production cycle for all standard-finished doors up to 250 lineal feet in size is two to three weeks. Shipping time averages five to ten days from the west coast to the east coast, with additional transit time required for shipments to Alaska, Canada, Hawaii and other offshore destinations. We do offer a rush 1-week production on standard materials up to 50 lineal foot at an additional charge.
Articles in this section
- Q: What is the maximum width on an Accordion Door?
- Q: Are Woodfold Accordion Doors sound rated?
- Q: Are Woodfold Doors made completely out of wood?
- Q: Can a Woodfold Accordion Door be installed directly to a suspended ceiling? If not, what kind of support is required?
- Q: Can a Woodfold Accordion Door be painted on-site?
- Q: Can a Woodfold Accordion Door be repaired once it's installed?
- Q: Can I exchange or return my door?
- Q: Can I order a door with two different colors of vinyl, front and back?
- Q: Can your Accordion Door be used outside?
- Q: Did Woodfold buy Panelfold?
Comments
0 comments
Article is closed for comments.